1212 Aventura is a LEED Gold mixed use complex at 21290 Biscayne Blvd in the Aventura Medical District, completed 2021 by Rieber Developments. Office condos for sale, senior living residences for rent, with a food hall and retail.
1212 Aventura is not a condo tower, and that is exactly its story. Completed in 2021 at 21290 Biscayne Boulevard, it is the anchor building of the Aventura Medical District: a LEED Gold mixed use complex by Rieber Developments, designed by Arquitectonica, that stacks a gourmet marketplace and food hall at street level, office condominiums above it, and 160 luxury senior living residences at the top. It stands directly beside Aventura Hospital, in a district of more than 300 medical practices, and it was built for the people who work in, visit and live off that ecosystem.
The for sale...
1212 Aventura is not a condo tower, and that is exactly its story. Completed in 2021 at 21290 Biscayne Boulevard, it is the anchor building of the Aventura Medical District: a LEED Gold mixed use complex by Rieber Developments, designed by Arquitectonica, that stacks a gourmet marketplace and food hall at street level, office condominiums above it, and 160 luxury senior living residences at the top. It stands directly beside Aventura Hospital, in a district of more than 300 medical practices, and it was built for the people who work in, visit and live off that ecosystem.
The for sale product here is the office condominium. The office suites, which range from about 340 square feet for a single practitioner to about 1,500 square feet, were sold to medical and professional users who wanted to own beside the hospital rather than lease across town, with 14 foot glass bringing in the light. The senior living component holds 160 independent and assisted living residences, leased rather than sold, with interiors by Interiors by Steven G. and dining and wellness programs run for residents. The ground floor marketplace, roughly 30,000 square feet of food hall and retail, serves the whole district at lunch and the building the rest of the day.
Rieber Developments, based in Aventura and led by Bernardo Rieber, paired the project with its sister building Ivory 214 nearby, which adds medical offices and a Tapestry Collection by Hilton hotel to the district. Together the two projects gave Aventura something it had never had: a walkable medical campus with its own food hall, hotel and residences. Aventura Mall sits less than a mile north, and the project site at 1212 Aventura tracks current office and leasing availability.
Office condominiums are the ownership opportunity at 1212 Aventura. Suites suit medical practices, professional firms and investors who want a hard asset inside the medical district, steps from Aventura Hospital's Level II trauma center, one of only two in Miami Dade County. Resale availability is thin because the original buyers were largely end users, so listings should be checked as they appear.
The residences at 1212 Aventura are luxury senior living apartments, offered for rent in independent and assisted living formats rather than for sale. Residents get dining, wellness programming and care services on site, with the hospital next door and the food hall downstairs, which is the entire point of the medical district concept.
Only in part. The office suites at 1212 Aventura are office condominiums that were sold to owners. The 160 residences are senior living apartments offered for rent, and the ground floor is a food hall and retail marketplace.
It is the cluster of medical buildings around Aventura Hospital on Biscayne Boulevard, home to more than 300 practices. 1212 Aventura and its sister project Ivory 214 were developed by Rieber Developments as the district's centerpiece.
The hotel sits at the sister project. Ivory 214, developed alongside 1212 Aventura by the same group, includes a Tapestry Collection by Hilton hotel with its medical and professional offices.
Arquitectonica designed the building for Rieber Developments, with common area and residence interiors by Interiors by Steven G. The complex is LEED Gold certified and was completed in 2021.
The completed building rises 10 stories. Early launch coverage described a 12 story scheme, but the building as delivered, documented in its construction case study, is 10 stories.
| CALL/TEXT for off market listings! 305.339.9898 |
| CALL/TEXT for off market listings! 305.339.9898 |
| CALL/TEXT for off market listings! 305.339.9898 |
| No sold listings found. |
| No rented listings found. |
Charter Schools
Charter Schools


